1932
The company has a unique history of star-up and stable development. In 1932, the first hydro unit of Dnipro HPP supplied current to the network for the first time, starting the annals of the company.
50s - 70s
The rapid development of hydropower took place in the 50s - 70s of the last century. It is then that new hydropower facilities appeared one after another on the largest Ukrainian rivers, the Dnieper and the Dnister.


1994
In 1994, the State Enterprise "Dniprohydroenergo" was established on the basis of Dnipro, Dniprodzerzhynsk, Kakhovka, Kremenchuk hydro power plants and the Cascade of Middle Dnipro HPPs.
1998
In 1998, the State Joint-Stock Power Generating Company "Dnistrohydroenergo" was established.


2003
One of the key stages of the company's formation was 2003, when the reorganization of Dniprohydroenergo and Dnistrohydroenergo took place. Through their merging, the State Joint Stock Company "Ukrhydroenergo" was set up.
The “patriarch” of the Ukrainian hydropower industry, Hero of Ukraine Semen Potashnyk, who held this position from 2004 to 2011, became the first Chairman of the Board of the company.
2011
In 2011, Ihor Syrota was appointed Director General of Ukrhydroenergo, a position he held until May 2025.


2019
The Supervisory Board of Ukrhydroenergo was established in 2019. It is a collegial body that consists of 4 committees, protects the rights of the Company's shareholders, carries out strategic management, and also analyzes and evaluates the activities of the Company's Executive Body.
2021
Introduction into industrial operation of the fourth hydro unit of the Dnister HPP, start of implementation of the project “Ukraine – Improving Power System Resilience for European Power Grid Integration (Installation of Hybrid Systems for Electricity Production in Ukrhydroenergo)


2022
The year 2022 was marked by serious challenges facing all sectors of the country’s life, including the energy sector. The world’s attention was focused on the massive missile attacks on Ukraine’s energy facilities, including the company’s hydroelectric and pumped-storage power plants. Cities and villages were left without power. Energy workers overcame blackouts and, despite all the difficulties, restored power to Ukrainian homes.
Before the russian invasion (24.02.2022), Ukraine had completely disconnected from the power grids of russia and belarus, and on March 16, Ukraine’s power system successfully synchronized with the European power grid ENTSO-E and began operating in test mode. Access to the European market opened up new export opportunities for hydropower companies.
2023
On June 6, 2023, at approximately 2:50 a.m. Kyiv time, military units of the russian federation damaged the structures of the Kakhovka Hydroelectric Power Plant through an internal explosion, which led to the destruction of the entire hydroelectric complex. As a result of the explosion inside the machine room, the Kakhovka Hydroelectric Power Plant was completely destroyed.


2024
Since the start of the full-scale invasion, the enemy has launched 150 attacks on Ukrhydroenergo’s power plants. These events have significantly impacted the company’s operations. Throughout the year, the company has been actively working to restore its power plants and equipment, paying particular attention to protection and safety.
In 2024, Ukrhydroenergo made it into the top 10 of the annual Index of Ukraine’s Best Companies and was included in the list of taxpayers with a high level of compliance with tax legislation - the “White Business Club.”
2025-2026
Throughout 2025, Ukrhydroenergo’s hydroelectric and pumped-storage power plants operated under challenging conditions marked by constant air raid alerts. After every missile or drone attack on the company’s facilities, specialists focused their efforts as much as possible on restoring damaged equipment as quickly as possible and recovering lost capacity. Restoration, safety, and security have been and remain the Company’s key priorities. Throughout the year, hydropower specialists maintained the operation of the plants and balanced the power grid.
2025 was a year of transformation for Ukrhydroenergo. In May, the company underwent management changes Bogdan Sukhetskyi was appointed acting Director General. From May 2026 to the present, Director General of Ukrhydroenergo has been Bogdan Sukhetskyi.