Operational information as of November 22
Station of Ukrhydroenergo are prepared for the autumn-winter period.
Ongoing reconstruction and major repairs of equipment continue.
Ukrhydroenergo is implementing projects aimed at enhancing safety, modernization, and reconstruction to protect its generating capacities, ensuring coverage of peak loads, frequency, and power regulation in the power system.
The average level of the lower reservoir near the dam of the Dnipro HPP is 13.91 m."
Copy link
Print
Фотогалерея