Ukrhydroenergo is completing preparatory measures for the autumn-winter period. This includes preparing equipment, hydraulic structures, production and service facilities, transportation, and communication. The company has completed all planned measures for the autumn-winter period.

Within the extensive repair campaign and restoration program, equipment reconstruction and repairs are ongoing.

Two hydro units with a total capacity of 46 MW have been started in one of the stations.

The average level of the lower reservoir near the Dnipro Hydroelectric Station dam is 13.61 meters.